Central Pollution Control Board
Effluent discharge standards for ETP & STP plants across India
Precision. Performance. Delivered.
1. Raw water intake & pre-treatment O&M
2. Clarifier, MGF, ACF & UF operations
3. RO plant operation & membrane PM
4. Coagulant, anti-scalant & disinfection dosing
5. Finished water quality testing & reporting
6. SCADA/PLC telemetry monitoring
7. Pump, valve & instrumentation PM
1. Industrial effluent characterisation & monitoring
2. Physico-chemical treatment & dosing
3. MBR / MBBR biological treatment O&M
4. Secondary clarification & sludge recycle
5. ZLD plant and evaporator maintenance
6. CPCB/SPCB compliance sampling & reporting
7. Sludge press operation & disposal
1. Sewage screening & grit removal
2. Aeration tank & blower system O&M
3. SBR / MBBR biological treatment
4. Secondary treatment performance monitoring
5. Chlorination & tertiary polishing
6. Sludge dewatering & disposal management
7. Treated water reuse system O&M
| Project / Client | Value - INR | Type | Capacity | Period | Key Scope |
|---|---|---|---|---|---|
| GK Dairy ETP | 2,50,000 per month O&M | ETP (MBR) | 200 KLD | 2024–Now | Design, Commission & Full O&M; CPCB Compliance |
| SVE 7 MLD ETP Project | 12cr EPC + 300000 per month O&M | ETP | 7 MLD | 2022–Now | Skid Design, RO & HPP Pump O&M |
| Johor River Water Works (JRWW) | 20 Cr+ 500000 Per Month O&M | WTP | Large Scale | 2023–2024 | Activated Carbon Replacement & Pre-treatment O&M |
| Singapore WRP Carbon Replacement | 30 Cr+ 750000 Per Month O&M | STP | 200 MLD | 2020–2023 | Carbon Media Replacement & Plant O&M Advisory |
| Changi Water Reclamation Plant | 25L Per month O&M | STP/WRP | Municipal | 2024–2026 | PUB PM, SCADA O&M, Process & Systems PM |
| High-Purity Industrial Water Skid | 1.5 Cr+ 100000 Per month O&M | WTP | Industrial | 2024 | Grundfos, DuPont MemCor, Pentair, Ionpure CEDI O&M |
| PUB WSP Chemicals & O&M | 2,00,000 per month | WTP | Municipal | 2024–2025 | Chemical Supply, Dosing System Advisory |
| Ibom FZE Raw Water Pretreatment | 3,500,000 for one year | WTP | Industrial | 2024 | O&M Scoping, MOM Documentation – Advisory Service |
| PLC Automation — WTP/ETP Plants | 1,00,000 per month O&M | WTP/ETP | Multiple | 2021–Now | PLC/SCADA/HMI Programming & O&M Support |
| VFD & Instrumentation — Treatment Plants | 1,50,000 Per month O&M | WTP/ETP/STP | Multiple | 2021–Now | VFD Commissioning, Calibration, Telemetry |
1. Coagulation & Flocculation
2. Multi-Grade & Pressure Sand Filtration
3. Activated Carbon Filtration (ACF)
4. Ultra Filtration (UF)
5. Reverse Osmosis (RO)
6. Continuous Electrodeionisation (CEDI)
7. Disinfection: Chlorination / UV
1. Physico-Chemical Treatment
2. Membrane Bioreactor (MBR)
3. Moving Bed Biofilm Reactor (MBBR)
4. Dissolved Air Flotation (DAF)
5. Reverse Osmosis (RO)
6. Zero Liquid Discharge (ZLD)
7. Filter Press & Sludge Dewatering
1. Activated Sludge Process (ASP)
2. MBBR Biological Treatment
3. Sequential Batch Reactor (SBR)
4. Tertiary Polishing
5. Chlorination & UV
6. Treated Water Reuse Systems
7. Online BOD/COD/TSS Monitoring
B.E. Chemical / Mechanical
Overall plant performance, compliance reporting, client coordination
B.E. / M.E. Chemical Engineering
Process monitoring, troubleshooting, optimization, chemical dosing control
B.E. / Diploma E&I
PLC/SCADA operation, instrument calibration, telemetry maintenance
Diploma / ITI Mechanical
Pump, valve, blower, filter press preventive & corrective maintenance
ITI / Diploma
Shift operations, log keeping, sampling, chemical dosing, housekeeping
B.Sc. Chemistry / Diploma
Effluent sampling, BOD/COD/TSS analysis, CPCB reporting data preparation
Effluent discharge standards for ETP & STP plants across India
State-level effluent discharge norms, consent management & OCEMS
Drinking water quality standards for WTP treated water output
PUB-regulated WRP/STP operations via Ion Asia & Acute Automation
OT/IT network segmentation & industrial cybersecurity (Spark Automation)
Real-time effluent data transmittal to regulatory server systems
Client: Rana Sugar Ltd
Capacity: 3.5 MLD
Project Type: Industrial Effluent Treatment & Reuse System
Process Scheme:
Equalization Tank → ASP → PAX Reactor → Aeration → UF → RO
Treated Water Re-use:
Cooling Tower Makeup Water
Scope of Work:
• Complete O&M of ETP & Tertiary Treatment
• UF & RO optimization
• Chemical dosing & sludge management
• Compliance monitoring & reporting
Manpower Deployed: 40 Personnel
Contract Duration: 2 Years
Client: Ramco Distilleries
Capacity: 1.5 MLD × 2 (Total: 3.0 MLD)
Project Type: Distillery Wastewater Treatment
Scope of Work:
• End-to-end plant O&M
• Process monitoring and control
• Utilities operation & maintenance
• Regulatory compliance support
Manpower Deployed: 23 Personnel
Contract Duration: 2 Years
Client: Jawa Port Authority, Gresik
Location: Gresik, Indonesia
Capacity: 2.2 MLD
Project Type: Seawater Desalination Plant
Scope of Work:
• O&M of Desalination System
• RO performance monitoring
• Preventive & breakdown maintenance
• Water quality assurance
Manpower Deployed: 14 Personnel
Contract Duration: 3 Years